Major repair of suburban house. Part 2

As a follow-up of review of work executed by us on overhaul of country house in Mytishchi district of Moscow Region we quote the next photoreport on interior furnishing of ground floor rooms of country house (the previous report here).

Task in hand: to execute finish of ground floor rooms of wooden country house, including:

— walls warming by slabby insulant with development vapour- water isolation;
— covering, filling, walls painting of gypsum plasterboard;
— development of thermal- acoustic isolation of inter-storied overlapping;
— finish of the bathroom with installation bathroom fixtures;
— restoration of inter-storied ladder with development of decorative lattice;
— mounting of electric wiring, switches, sockets, illuminating devices;
— alignment of the floor, the stacking of floor cover.

Progress of work: So, the first thing old covering (in initial place), as well as interroom partitions was demounted. To photo below are presented the types of rooms after performance of works on dismantle:

Upon completion of dismantling works were equipped engineering systems, namely: the water-supply system of suburban house from polypropylene pipes was laid; electrical wiring on rooms of ground floor was performed; ventilation channels were equipped.

Following steps of finishing work: warming of house exterior perimeter over the walls; installation of metal skeleton; installation; priming; filling of gypsum plasterboard. Separate attention should be turned that in the places of future installation of kitchen headset, suspended capboards etc., in metal skeleton the beams of strengthening were mounted. On the photo below You can see the phases of above-mentioned finishing work:

At the conclusion of gypsum plasterboard installation comes turn of warming and sound insulation of inter-storied overlapping. Given work was performed using slabby sound isolating material «Rockwool Acoustic». After flooring winterization was performed priming, filling and walls painting of ground floor of suburban house, as well as floor cover is stacked (in this instance there — is a bamboo panel). Result of specified works is presented on the photo below:

Special mention should be made of finish of decorative casing of furnace flue duct. Given work was executed in a few phases. Phase 1: after installation of chimney by the manufacturers and its finish by non-combustible cover it was performed classical filling of casing for supplying of vertical position and surface integrity. So to say, subbase installation. Under what? Under the second phase, namely under finish by Venetian plaster with effect of «rain». So, phase 2 — it is casing finish by Venetian plaster. Well, and closing stage became painting of casing. The photos of the work stages and the final result flue finish are presented on the photo below:

Well, and ultimate phase of interior furnishing of ground floor rooms of suburban house became installation of electrical outlets, switches, illuminating devices, kitchen headset, bathroom fixtures, as well as restoration of inter-storied ladder and construction of decorative guard lattice along the ladder. You can see result of performed finishing work to photo below:

You can be acquainted more clearly with result of performed works on finish of ground floor rooms of wooden suburban house at review of the video clip:

On following photo are presented the key players — construction and mounting brigade of LLC «Dachny master» which executed all kinds of construction and finishing work on given object:

In more detail with progress of work it is possible become acquainted in our photogallery. Total performance time on interior furnishing of ground floor rooms of country house and all extra works accounted for 45 days.

Похожие статьи

  • Наши статьи 2024

Дачный мастер: столярное направление работ

Не так давно мы писали о том, что в рамках нашей компании было решено открыть еще одно направление работ -…

  • Наши статьи 2024

Красивый дом, с продуманной планировкой для большой семьи

Рассмотрим поподробнее еще один проект дома от нашей компании (мы также писали о нем ранее). Проект называется "Шерлок", выполнен в…

  • Наши статьи 2024

Стильный теплый дом для небольшой семьи

Рассмотрим подробнее еще один наш проект дома, выполненный в стиле "Барнхаус". Название модного нынче стиля, происходит от немецкого слова "Barnhouse",…

  • Наши статьи 2024

Теплый и вместительный каркасный дом. Проект «Классика»

Сегодня рассмотрим один из проектов разработанных нашей компанией, уже построенный и эксплуатируемый порядка 13 лет. Итак, пройдем по основным техническим…

  • 2024. Коммерческие статьи

Ремонт холодильных камер

Холодильная камера представлена стационарным оборудованием, которое используется на крупных производствах, в местах общественного питания, супермаркетах, складах и других коммерческих заведениях,…

  • Наши статьи

Как установить розетку в доме из бревна?

Для начала давайте разберемся, какие типы проводок можно вообще делать в бревенчатом доме. По большому счету типа два - открытая…