In today’s review we will tell still about one not very big but interesting work performed by our company in one of the settlements on Kiev Highway. Works were executed within a framework external finish of veranda and loggia of frame suburban house.
Task in hand: To protect from hit of precipitation to veranda and loggia of frame house. For this purpose by us decision was offered to close fencing structures with cellular polycarbonate, and openings above fencing structures — with special hard film, on type of that which is installed in sidewalk cafe which should be moved on steel cables for opening — closure (principle of window curtain). As we have nothing to do as of film, our work was limited by installation of cellular polycarbonate and, additionally, Customer entrusted mount a guttering on roof projections.
Progress of work: On the photo below You can see object up to external finish of the veranda and loggia with cellular polycarbonate, as well as before installation of guttering:
Taking into account cold season, as well as absence of heating on the object, by us was accepted decision of work material conversion, including their slicing, wood preservation, colouring on our base. After performance of specified preparatory works all material were delivered on object:
Directly finishing of enclosing structures of frame house presented following: to each cell, on it perimeter, were mounted prepared support rods, to which polycarbonate is mounted. Result of finish of the veranda and the loggia of frame house You can see on the photo below:
Following and closing stage of our work was installation of guttering on roof projections. Here there is nothing to describe especially in detail — the sole, on that it is worth to pay attention, it is necessity of reliable fastening of guttering, as well as observance of slopes. We as well pay Your attention that we can offer very attractive prices both on installation and on materials of guttering. You can see result of work on installation of guttering on photo below:
In more detail with progress of work it is possible become acquainted in our photogallery. Total performance time of works on finish of the veranda and the loggia of frame suburban house by cellular polycarbonate, as well as on installation of guttering accounted for 5 days.