Beginning with this review, we begin the series of photoreports of executed our company to work on overhaul of country house in Mytishchi district of Moscow Region.
Task in hand: to perform works on complex overhaul of country house, including:
— reconstruction of water-supply system with development of swing station (well/summer water supply system);
— reconstruction of floors, walls, ceiling in wooden frame addition to the structure;
— overhaul of the power supply system (total replacement of the electrical wiring, electroswitchboard equipment, installation and startadjusting of generating unit);
— indoor finish of rooms of the first and second storeys (plasterboarding on metal skeleton, warming of outward walls, sound insulation of inter-storied overlapping, walls and ceiling painting, the stacking of bamboo panel);
— the installation of plumbing equipment.
Progress of work: In this review we briefly will tell about reconstruction process of the water-supply system, as well as of overhaul of frame addition to the bar-shaped structure. So, to photo below is presented the object of overhaul — country house:
To photo it is shown that the object of overhaul consists properly of house constructed from square-sawn timber and frame addition. Frame addition to the house in the plan consists of three rooms located to single line. On Customer’s concept, in the addition should be located vestibule before entrance to house (in the centre from addition), boiler-room (on the one hand from vestibule), as well as the room of economic assignment (on other party from vestibule).
Taking into account insufficient condition of interior furnishing of addition, was accepted decision of its total reconstruction, including the bulkhead of the floor, walls, ceiling. On the photo below are presented the addition walls after dismantle of interior paneling, as well as floor, but already after performance of work on warming:
During works on reconstruction of frame addition to the house, was replaced warming of the floor, walls and ceiling, electrical wiring, pipes, equipment of the water-supply system and interroom partitions. All addition is plated with plywood, to which is mounted gypsum plasterboard on metal skeleton. To photo below are presented intermediate totals of given work:
Now a few words about water-supply system of suburban house. In this instance task stood to realise the water-supply system with the knot of switching of water delivery from well or from summer water supply system. On the photo below is presented outline of water delivery switching. Besides Customer has the problem of very weak filling of the well. For its decision additional underground storage tank for water of volume of 2 cubic metre was mounted, therefore the water-supply system works on following principle: water feed to intermediate capacity, and already from it water delivery to house is implemented. Of erection procedure of underground storage tank we will tell in more detail in following press release:
For subsequent installation of the boiler of heating was mounted podium from gasconcrete blocks plated from above by metal sheet:
After performance of above-mentioned works on finish of frame addition was performed priming, spackling, painting of gypsum plasterboard, was installed boiler equipment (installation was led by forces of the company-manufacturer), equipment of the DHW system. Separate attention should be paid to the system of hot water-supply. In this instance the DHW system is performed to combined: with opportunity of switching of the boiler of indirect heating to electric boiler. On the photo below You can see progress on finishing of frame addition:
For more visualisation of progress on finishing of frame addition: in country house and in particular boiler-room, below is presented the video of progress:
In more detail with works progress it is possible become acquainted in our photogallery. Total performance time on major repairs of frame addition and all extra works accounted for 45 days.