Top.Mail.Ru

Major repair of suburban house. Part 3

We quote the next review of work executed by us on overhaul of country house Mytishchi district of Moscow Region (the previous reports are here and here).

Task in hand: to execute an interior furnishing of the second storey rooms of wooden suburban house, including:

— dismantle of existing frame partitions;
— walls warming by slabby insulant with development of vapour- water isolation;
— walls covering by gypsum plasterboard, them filling and painting;
— finish of decorative casing flue duct;
— reconstruction of engineering systems (of electric power supply, water-supply, water removals) by the way of their total replacement;
— finish of the bathroom with installation bathroom fixtures;
— mounting of switches, sockets, illuminating devices;
— alignment of the floor, the stacking of floor cover.

Progress of work: As in last report, the first thing was demounted old covering (in initial place), as well as interroom partitions. To photo below are presented premises after performance of work on dismantle:

Upon completion of dismantling works were equipped engineering systems, namely: the water-supply system of the second storey of suburban house from polypropylene pipes was laid; electrical wiring on rooms was performed; ventilation channels were equipped.

Then was performed warming of house exterior perimeter on walls, development of metal skeleton, installation, priming, filling of gypsum plasterboard. Complexity consisted that for economy, by Customer decision was taken to preservation of maximum area of existing covering (gypsum plasterboard), i.e. new designs should be exhibited only by the places, joining and adjusting them under already existing. Besides at stage filling and painting it was necessary “to remove” plane of new and existing designs for supplying of integrity of future wall. To photo below You can see the phases of set forth above finishing work:

After installation, filling, painting of gypsum plasterboard came turn of the stacking of floor cover — of bamboo panel, as well as installation bathroom fixtures in the bathroom, the installation of interroom doors, metal fittings and them trim. Result of specified works is presented on the photo below:

As in the previous photoreport, closing stage of interior furnishing of the second storey rooms of suburban house became installation of sockets, switches, illuminating devices. More clearly with result of performed works on rooms finish of second storey of wooden suburban house You can be acquainted at review of the video clip:

In more detail with progress of work it is possible become acquainted in our фотогалерее. Total performance time on interior furnishing of ground floor rooms of country house and all extra works accounted for 30 days.

Вы можете оставить свой комментарий

Подписаться
Уведомить о
guest
0 комментариев
Старые
Новые Популярные
Межтекстовые Отзывы
Посмотреть все комментарии

Здесь можно поискать то, что Вам нужно

Посмотрите примеры работ по направлениям

Поизучайте полезную информацию

Подпишитесь на обновления, акции, скидки

Хотите быть в курсе новых работ, скидок, акций, которые мы периодически проводим?

Все, что для этого нужно - просто заполнить два поля ниже и нажать на кнопку "Подписаться"

Наш Telegram-канал

Другие примеры...

Строительство и отделка каркасного дома

Строительство и отделка каркасного дома

Еще один обзор, выполненной нами работы, на этот раз по строительству и отделке каркасного дома…
Внутренняя отделка коттеджа

Внутренняя отделка коттеджа

Еще один пример комплексной работы по внутренней отделке коттеджа, выполненной нами в 2018 году. Для…
Технический надзор за строительством дачного дома

Технический надзор за строительством дачного дома

Наверное всем очевиден факт, что без определенного уровня знаний в области строительства, возведение надежного и…